Yes. Discounts start at 10 or more of the same SKU per order.
Archives: FAQs
How long does it take to prep it for pack-out?
It can take as little as one hour to condition the PCM panels, and as little as 2 minutes to pack it out. See User Guide for complete instructions.
How long does it take to prep the Cool Cube™ for pack-out?
It can take as little as one hour to prep the PCM panels, and as little as 2 minutes to pack it out. See User Guide for complete instructions.
Which panels hold what temperature?
The Cool Cube panels are identified by both the label and tab colors: Blue: For Refrigerator Temperatures PCM, used in the VT and BT product lines. Gray: For Lab Freezer PCM, used in the FT line of Cool Cubes. Tan: For Room Temperature PCM, used in the RT line of Cool Cubes.
When are panels ready for use?
To prevent the cooler from warming (in hot conditions), panels should be solid. To prevent the cooler from cooling (in cold conditions), panels should be liquid.