Cool Cube™ 28 at Refrigerator Temps

For Vaccine, Medicine & Other 2-8°C Products
SKU:
VT-28

A laboratory qualified system that utilizes PCM technology to keep product such as fresh vaccine and medicine safely between 2°C and 8°C for 103+ hours without the need for electricity, ice or buffering material. Ideal for off-site vaccinations, long-term transportation and power outage backup.

$1,499.00

Add Accessories

3mL Luer Lock Safety Syringe with 23G Needle (Box of 100)

3mL luer lock safety syringes with a detachable needle help keep clinicians safe while providing maximum clinical flexibility.

Memory-Loc™ Temperature Monitoring & Data Logger Kit

A data logging thermometer that locks over 1 million temperature observations (good for 21 CFR 11 environments). This calibrated logger has user-defined time intervals, downloads data to any USB stick, and meets current CDC requirements.

The Cool Cube™ 28 at Refrigerator Temperatures (VT-28) is not an ordinary vaccine transport cooler and medicine carrier. It is a lockable, wheeled, qualified container and pack-out system that keeps temperature sensitive product such as fresh vaccine and medicine chilled between 2° and 8°C for over 4 days – without using ice or electricity! This cooler is ideal for transport, but also excels at protecting valuable product during off-site use and power outages, regardless of hot or freezing conditions. The simplified, validated, patented technology is the best compact thermal protection product available to maintain the cold chain!

Technology & Features

28 CC tech1 magnifying
cutaway tan with numbers
exploded-Cool-Cube-Tan

Phase Change Technology





Cool Cube™ PCM (phase change material) is engineered to maintain a constant temperature at a specific melt/freeze point. PCM empowers the user with a safe, effective means to maintain the temperature of valuable product.

Temp-Shield™ Insulation






Vacuum insulated panels (VIPs) offer advanced thermal protection far superior to other types of insulation. The temperature-holding qualities ensures the user a long-lasting, consistent temperature hold for days.

Transport Case




Each outer case is built with mobility in mind. Various features enable the user to move with confidence and know the contents are well protected (and at the correct temperature) during transit and use.

Additional Features

PCM Panels

VIP System

  • Six panels for refrigerator temperatures included.
  • Patented, beveled-edge design seamlessly fit together.
  • Panels are interchangeable with other temperature systems.
  • Reusable (10,000+ cycles)
  • Reinforced, clear-plastic, protective wrap.
  • Rigid structure is durable and light.
  • 5x the resistance (R-value) of conventional insulation.
  • Removable and replaceable.

Dimensions & Specs

Outside: 20½” x 20½” x 23″
Inside: 12″ x 12″ x 12″
Weight: 61 lbs.

    Cool Cube™ 28 scaled with people-200x200
    Cool-Cube-28-Capacity-600v-43
    28 CC dims view
    Cool-Cube-28-Top-Dims
    Cool-Cube-28-top-open-VT-BT-250x300
    stamp qualified

    Easy & Safe Pack-Out

    Vaccine For Children (VFC) Compliant
    Refrigerated Prep Steps 1-5

    EXTENDED TRANSPORT

    No worries for several days! This validated system will hold 2-8°C (36°-46°F) for an extended time, even in harsh environments. It is long-lasting, passive temperature-controlling technology when you need it most.

      extended transport a
      off-site initiatives

      OFF-SITE INITIATIVES

      Ideal for outreach clinics and field missions! This easy-to-use system eliminates the complicated steps found with other methods, and simplifies/expedites the pack-out process. Packed with mobility features, it can go anywhere it’s needed.

      EMERGENCY BACKUP


      A great solution to keep things safe during power outages! Since it does not rely on ice or electricity, next time the refrigerator goes down have this storage AND transport solution as a backup. Reduce the risk with a Cool Cube™.

      emergency backup a
      have-questions-750x273

      Refrigerator Cool Cube™ Preparation Methods

      All - Refrigerated Prep Methods All - Refrigerated Prep Methods

        *Panels may be stored at this stage indefinitely (for longer than indicated).

      old to new stamp - refrigerator

      About Refrigerator PCM (Phase Change Material)

      PCM absorbs and releases thermal energy during the process of melting and freezing. When solid PCM melts, it absorbs the heat from the environment, yet its temperature stays at the melting point until totally liquid. Conversely, when liquid PCM freezes, it absorbs the cold from the environment yet stays at its temperature until totally solid. Therefore, PCM an ideal, passive solution for a variety of applications that require temperature control. The most common PCM is water, which has a melting point of 0 °C (32 °F). When solid, ice/water maintains a temperature of 0 °C until it turns completely liquid. So, in essence, the 0 °C melting point makes it unsafe for most refrigerator temperature sensitive applications.

      Cool Cube™ Refrigerator PCM has a melting point of 4.5 °C/40.1 °F. When the PCM is solid, a panel helps the Cool Cube ™stay cool (about 5 °C) in warm/hot environments. When the PCM is liquid, a panel helps the Cool Cube ™stay warm (about 4 °C) in freezing conditions. It’s right around that 4.5 °C/40.1 °F where a PCM panel’s temperature plateaus for a while during the warming up and/or cooling down processes.

      Refrigerated Prep A - Freezer-Fridge Prep to keep product cold

      Refrigerated 4 Prep Method A: Freezer to Fridge Pack-Out Instructions

      Panel Prep

      2.1 Lay panels flat in a freezer until all the PCM (phase change material inside the panel) turns solid. At -15°C/5°F the PCM will solidify in a couple hours.

      2.2 Transfer panels into a fridge at least 3 hours before use. Panels may be stored in the fridge until needed for assembly or until the PCM melts.*

        * If a fridge maintains 4°C/39°F or below, the PCM within the panels will not melt (melting point is 4.5°C/40°F), which will keep the panel solid indefinitely until pack-out. If the fridge maintains 5°C/41°F or above, periodically check for melting and restart at step 2.1 to ensure optimal performance.

      Shake PCM Panel To Check

      2.3 Shake panels to verify the PCM is solid. If there is liquid, restart at step 2.1 to ensure the longest hold time. Using liquid PCM or panels with a solid/liquid combination decreases the hold time.


      Refrigerated Prep B - Fridge ONLY Prep to keep product cold

      Refrigerated Prep Method B: Fridge Only Pack-Out Instructions

      Panel Prep

      2.1 Lay panels flat in a refrigerator for a minimum of 24 hours before use.

      2.2 Shake panels to check the state of the PCM (phase change material inside the panel).

      Shake PCM Panel To Check

              • If liquid…panel is at the fridge temp but above 5°C; anticipate shorter hold times.
              • If solid…panel is at the fridge temp but below 4°C; ideal for maximum hold times.
      • If solid/liquid combination…panel is at the fridge temp of 4-5°C; monitor time/temp.

      In a refrigerator that maintains 4°C or below, the PCM will be solid (ideal for keeping product cold in warm/hot conditions). In a refrigerator that maintains 5°C or above, the PCM will be liquid. Although the PCM is liquid, the panel is at the temperature of the storage environment after 3 hours (i.e., stored in a 6°C fridge, the panels are at 6°C). Assembling the Cool Cube™ with liquid PCM panels (additional thermal mass) will help keep the product at its temperature, just for a shorter amount of time. Monitor Cool Cube™ temperature closely.



      Refrigerated - Prep Method C - Freezer-Room Prep to keep product cold

      Refrigerated Prep Method C: Freezer to Room Pack-Out Instructions

      Panel Prep

      2.1 Lay panels flat in a freezer until all the PCM (phase change material inside the panel) turns solid. At -15°C/5°F the PCM will solidify in a couple hours.

      2.2 Transfer panels into a room temperature environment just before use to allow the PCM inside to rise to the appropriate operating temperature. Approximate times:

              • “03” size = 25 minutes
              • “08” size = 30 minutes
              • “28” size = 35 minutes
              • “96” size = 40 minutes
        **Times based on a 22°C/72°F room.

      PCM Panel Staging Time Reference Chart

      2.3 Wipe off condensate. After frost turns to condensate, the panel is above 0°C.

      Shake PCM Panel To Check

      2.4 Shake panels to verify the PCM is solid. If a little liquid is heard, it is at 4.5°C. If there is a lot of liquid, restart at step 2.1 to ensure the longest hold time. Using liquid PCM or panels with a solid/liquid combination decreases the hold time.


      Series 4 - Refrigerated Prep D - Fridge Prep to prevent freezing

      Series 4 Prep Method D: Fridge Only Pack-Out Instructions (to prevent freezing)

      Panel Prep

      2.1 Place panels in a fridge between 5° and 8°C for at least 24 hours before use so the PCM (phase change material inside the panel) is liquid.*

        * Panels may be stored in the fridge until needed for assembly or the PCM solidifies. If a refrigerator maintains 5°C or above, the PCM within the panels will not get solid (the solidifying point is 4.5°C), keeping the PCM liquid indefinitely until pack-out. Liquid PCM panels will protect the product from freezing until the PCM becomes completely solid.

      Shake PCM Panel To Check

      2.2 Shake panels to verify the PCM is liquid. If solid, restart at step 2.1 to ensure the longest hold time. Liquid PCM will prevent the product from freezing (at refrigerator temps) in extreme cold the longest. Using solid PCM or panels with a solid/liquid combination decreases the hold time.


      Series 4 - Refrigerated Prep D - Fridge Prep to prevent freezing

      Refrigerator PCM Prep Method D: Fridge Only Pack-Out Instructions (to prevent freezing)

      Panel Prep

      2.1 Lay panels flat in a freezer until all the PCM (phase change material inside the panel) turns solid. At -15°C/5°F the PCM will solidify in a couple hours.

      2.2 Transfer panels into a room temperature environment just before use to allow the PCM inside to rise to the optimal 1°C. Approximate times:

      “03” size = 5 minutes

      “08” size = 10 minutes

      “28” size = 15 minutes

      “96” size = 20 minutes

      2.3 Wipe off condensate & shake.After frost turns to condensate, the panel is above 0°C. Shake panels to verify that the PCM is completely solid. If liquid is heard, re-freeze (Step 2.1) and proceed. Using liquid PCM decreases the hold time considerably.

      asterisk 3

      After Step 3 (before pack-out), insert a thermometer and close to monitor when the Cool Cube™ gets to the 1°C mark. If below the 1°C mark, wait until it warms up to 1°C before packing out. To speed up the process, transfer panels into a room temperature environment for a couple of minutes and re-check. Pack-out at 1°C will ensure a maximum hold time between 1° and 6°C.


      Thermal Properties of Series 4 PCM Panels

      Phase change materials (PCMs) are materials that absorb and release thermal energy during the process of melting and freezing. When a PCM melts, it absorbs the heat from the environment, yet its temperature stays at the melting point until totally liquid. Conversely, when a PCM freezes, it absorbs the cold from the environment, yet stays at its temperature until totally solid. This makes PCM an ideal, passive solution for a variety of applications that require temperature control. The most common PCM is water/ice. Ice is an excellent PCM for maintaining temperatures at 0°C. But water’s freezing point is fixed at 0°C (32°F), which makes it unsuitable for most temperature sensitive applications.

      Cool Cube™ PCMs offer custom temperature holds based on their melting point. The PCM inside Series 4 panels has a melting point of 4.5°C/40.1°F. When panels are solid, contents within the Cool Cube™ stay cool (at fridge temps around 4.5°C) in hot conditions during an extended period of time. When panels have liquid inside, contents within the Cool Cube™ won’t freeze (again at fridge temps around 4.5°C) in extreme cold during an extended period of time.

      When the panels have reached 4.5°C and are completely solid, they are ready to hold your product. To verify that they are solid simply shake the panel. If you shake the panel and it feels and sounds slushy, with some liquid and some solid it will hold your product at a cool temperature, but it won’t hold it as long as if the panel is completely solid. If you shake the panel and it feels and sounds completely liquid, put the panel back into the freezer/refrigerator and continue to condition until the panel has reached a solid state.

      Shake a panel at various times to get to know your panels. For example, shake the panels when you know they are warm to hear and feel how they react when they are liquid. 

      Within this webpage are several methods for conditioning your PCM panels. The standard conditioning method is performed in the refrigerator. The advantage of the refrigerator is that your panels won’t get too cold. This method can take from 8-24 hours. Alternatively, if you need to use your panels sooner than 8-24 hours, they can be conditioned in a freezer.

      PCM panels can be frozen too cold, but there is an easy solution when this occurs. When the panels are frozen to a point below 0°C/32°F, a short staging period is necessary to safely transport your product. If your panels have been stored in the freezer simply take the panels out of the freezer and lay them, individually (unstacked), on a flat surface at room temperature for roughly 30 minutes.

      Hold times of the PCM panels vary depending on Cool Cube™ size and desired holding temperature. For example, when properly packed-out into the Cool Cube™ 08, the Series 4 PCM panels can hold the cooler at a temperature below 8°C and above 2°C for 76 hours.

      With all pack-out procedures, be sure to use a temperature monitoring device to consistently and accurately monitor the temperature your payload for the entire time it is held in the Cool Cube™. Some regulatory bodies such as the CDC require the use of a certified data logger. VeriCor carries several types of thermometers and digital data loggers that meet the CDC recommended guidelines.

      Series 4 PCM - ISTA 7D Thermal Performance Study Temperature Hold Times

      Cool Cube™ User Guide

      [wpfilebase tag=file id=433/]

      Cool Cube™ Series 4 Panel Sizes and Specs

      Cool-Cube™-with-series-4-PCM-&-Dims


      Refrigerator PCM Temps Hold Time

      Hold-temps-Series-4

       

      PCM Panel Prep Steps Sequence

      PCM Panel Spacing Customer Solution

        • Always prep the PCM panels before use according to one of the described methods provided by VeriCor.
        • Ensure all components are clean and free of damage.
        • During prep, enable ample air flow around all panel sides (use spacers or racks).
        • Lay panels flat when “freezing”.
        • Freeze/melting times vary depending on number of panels being prepped and equipment specifications being used. Assemble using all six panels for maximum hold time.
        • Using less panels does not change the holding temperature but does decrease hold time.
        • Panels are reusable (10,000+ cycles). (End-of-life disposal: panels use a plastic #2, typically recycled by businesses/communities; PCM is nontoxic and readily biodegradable.)
        • Use a calibrated data logger or other temperature monitoring device to observe internal temperature.
        • Avoid unnecessary opening of the Cool Cube™ after loading payload. Opening of the Cool Cube™ will decrease hold time.
        • An infrared temperature thermometer can assist in ensuring the panels reach a safe pack-out temperature (good for finding out the approximate temperature of each panel).
      • Further the temps are away from the melting point, the quicker PCM will change states.

      CLICK & PRINT DOWNLOADS (PDF)

      have-questions-plus-number-2

      (click or scroll to explore)
      PCM Prep Methods
      Temp Monitor Integration

      Cool Cube™ Refrigerator PCM Prep

      Cool Cube™ Refrigerator PCM – Prep Introduction

      Prep Method A – Keep product cold (in warm conditions)

      Prep Method B – Keep product cold (in warm conditions)

      Prep Method C – Keep product cold (in warm conditions)

      Prep Method D – Prevent freezing (in extreme cold)

      Prep Method E – Keep product cold (in warm conditions)* Freezer/Room Prep to maintain 1-6°C

      Cool Cube™ General Use Videos

      Using a Corded Temperature Monitor with the Cool Cube™ 03

      Routing a Corded Probe through the Cool Cube™ 03

      The Cool Cube™ 03 has clear plastic, external pockets for holding a temperature monitor (or other things) during use. When using a device with a corded probe, here’s how you can do it:

      1. After packing out the product, place the probe within the chamber as if it were the product.
      2. Route the cord to a corner of the Cool Cube™, where the panels meet.
      3. Place the last PCM panel on top to complete the chamber.
      4. Close the lid of the Cool Cube™
      5. Zip the two zippers around the cord where it comes out
      6. Plug the cord into the temperature monitor and place it in a pocket of the Cool Cube™.

      **Best Practice: Condition the probe to the target temperature before integrating it into the Cool Cube™ chamber.

      FAQs

      Search FAQs


      VT-28 Specific FAQ

      When properly conditioned, the VT-28 will hold temperatures between 2°C and 8°C for at least 103+ hours.
      1. Place panels in a freezer until all PCM turns solid (i.e. 2 hrs. @ -15°C). Shake to verify.
      2. Transfer panels into a fridge at least 3 hours before use. Panels may be stored in the fridge until needed for assembly or the PCM melts.*
      3. Before assembly, shake panels to verify PCM is solid. If liquid is heard, restart at step 2a to ensure longest hold time. Using liquid panels, or panels with a solid/liquid combination, decreases hold time.
      *If a refrigerator maintains 4°C or below, the PCM within the panels will not melt (melting point is 4.5°C), which will keep the panel solid indefinitely until pack-out. If the refrigerator maintains 5°C or above, periodically check for melting and restart at step 2a to ensure best performance.

      The time varies between prep methods:

        • Method A: ≈ 5 hours
        • Method B: ≈ 24 hours
        • Method C: ≈ 3 hours

      In the user guide we recommend Method A, although all methods work. Choose the method that works best with your schedule.

      If you store the PCM panels in your refrigerator they will be available to use whenever you need them. Shake the panels to see if they are solid. If they are slushy your refrigerator is too warm. If the panels are slushy they will still work, but the hold times will be decreased.

      Prep Method A:

      1. Place panels in a freezer until all PCM turns solid (i.e. 2 hrs. @ -15°C). Shake to verify.
      2. Transfer panels into a fridge at least 3 hours before use. Panels may be stored in the fridge until needed for assembly or the PCM melts.*
      3. Before assembly, shake panels to verify PCM is solid. If liquid is heard, restart at step 2a to ensure longest hold time. Using liquid panels, or panels with a solid/liquid combination, decreases hold time.
      *If a refrigerator maintains 4°C or below, the PCM within the panels will not melt (melting point is 4.5°C), which will keep the panel solid indefinitely until pack-out. If the refrigerator maintains 5°C or above, periodically check for melting and restart at step 2a to ensure best performance.
      Click here for a detailed guide to all of the prep methods.

      Vaccine Transport Specific Cool Cubes™

      The PCM inside is NOT below its phase change temperature of 4.5°C/40.1°F. Make sure that the storage temperature is always below 4°C/39.2°F.
      Yes, for Cool Cubes™ at Fridge Temps. However, before pack-out, the panels must sit out and warm up until they “sweat” so that they don’t make the cooler too cold.
      Yes, for Cool Cubes™ at Fridge Temps. Make sure the refrigerator temperature is below 4°C to ensure panels turn solid (the closer the fridge is to 4.5°C, the longer it will take to turn solid).

      Yes. The panels can be stored in a refrigerator for as long as you wish. If stored in the refrigerator they will be ready for use whenever you need them.

    • Only store the PCM panels in the refrigerator. It is not necessary to condition the VIP container.
    • Make sure to shake the panels to see if they are solid. If they are not solid your refrigerator is not cold enough. If the panels are still slushy they will still work, but they will not hold product for the optimum time frame.

      General Cool Cube™

      Components

      Yes, replacement Cool Cube PCM panels are available for purchase. If you need to replace any PCM panels, you can order them individually from our Cool Cube Components page. The panels are available for all temperature ranges, including:

      • Refrigerator PCM Panels (Blue Tab): 2°C to 8°C.
      • Lab Freezer PCM Panels (Gray Tab): -50°C to -15°C.
      • Room Temperature PCM Panels (Tan Tab): 15°C to 25°C

      If you’re unsure which panels you need or have any questions, feel free to call us at 608.526.6901, and our team will be happy to assist you in finding the right replacement parts.

      If any part of your Cool Cube gets damaged, don’t worry—all components, including PCM panels, Temp-Shield™ Insulation System (vacuum insulation panels), and other accessories, are available for individual purchase on our website. You can browse and order replacement parts directly from our Cool Cube Components page. This allows you to replace just the part you need without having to buy a whole new system.

      If you’re not sure which part you need or have any questions, feel free to give us a call at 608.526.6901. Our customer service team is available to assist you and ensure you get the correct replacement part. We’re here to help with any concerns or issues you may have.

      A PCM panel in the Cool Cube is a key component that uses Phase Change Material (PCM) to help regulate the temperature inside the unit. These panels are designed to maintain specific temperature ranges crucial for protecting temperature-sensitive items like vaccines, medicines, and biological samples.

      Each PCM panel contains a material that melts and solidifies at precise temperatures. As the surrounding temperature increases, the PCM inside the panel absorbs the heat and melts, stabilizing the environment. When the temperature decreases, the PCM solidifies and releases the stored heat, preventing the interior from cooling too rapidly.

      In the Cool Cube, there are different types of PCM panels, each indicated by a color-coded tab, designed to maintain different temperature ranges:

      • Refrigerator PCM Panels (Blue Tab): 2°C to 8°C.
      • Lab Freezer PCM Panels (Gray Tab): -50°C to -15°C.
      • Room Temperature PCM Panels (Tan Tab): 15°C to 25°

      Each Cool Cube comes with 6 PCM panels that make up the PCM System.

      Answer:

      The VIP System, or Vacuum Insulated Panel System, is a cutting-edge insulation technology used in Cool Cube products to provide superior thermal protection. VIPs are constructed with a core material surrounded by a vacuum-sealed barrier. This combination offers exceptional insulation, far more efficient than traditional materials like foam or polyurethane. Here’s how it works:

      1. Vacuum Insulation:

      The vacuum inside the panels minimizes heat transfer by significantly reducing conduction and convection, which are the primary ways heat is transferred. This vacuum environment is key to achieving the high thermal resistance, or R-value, that makes VIPs so effective at keeping heat out and cold in (or vice versa).

      2. Efficiency:

      VIPs can be up to five times more effective than conventional insulation, meaning they can maintain stable internal temperatures for much longer periods. This is particularly crucial in applications where temperature-sensitive products like vaccines, medicines, or biological samples are being stored or transported.

      3. Durability:

      VIPs are built to last. The protective outer wrapping around the core helps ensure that the vacuum remains intact, maintaining the panel’s high insulation performance for years. Even after five years, VIPs can retain up to 95% of their original insulating power.

      4. Application in Cool Cubes:

      In Cool Cubes, the VIP System works in tandem with PCM (Phase Change Material) panels to maintain precise temperature control for long durations, even in extreme conditions. The VIP System is housed within the outer case of the Cool Cube, ensuring that internal temperatures remain stable without relying on electricity or ice.

      By utilizing VIP technology, Cool Cubes offer reliable, energy-efficient temperature control for critical applications like medical transport, off-site vaccination efforts, and emergency preparedness.

      PCM, or Phase Change Material, is a type of substance that can store and release large amounts of thermal energy as it changes from one state of matter to another, specifically between solid and liquid phases. This ability to absorb and release heat during its phase transitions makes PCM useful for controlling temperatures.

      Here’s how it works: When a material melts (changes from a solid to a liquid), it absorbs heat from its surroundings, which cools down the environment around it. When the material freezes (changes from liquid back to solid), it releases the heat it had absorbed, warming up the environment.

      What makes PCM special is that it is engineered to melt and freeze at very specific temperatures, depending on its formulation. For example, some PCM might be designed to melt at a relatively low temperature, like 5°C, while others might melt at higher temperatures. This allows PCM to be used for different applications, like keeping things cool or warm without the need for constant external energy, such as refrigeration.

      Because PCM changes phases so efficiently, it can absorb or release a lot of heat without changing its own temperature much during the process. This makes it an excellent tool for maintaining stable temperatures over time, which is critical for safely transporting temperature-sensitive products like vaccines, medicines, and biological samples.

      Vacuum Insulation Panel – a form of thermal insulation consisting of a gas-tight enclosure surrounding a rigid core, from which the air has been evacuated.

      Answer:

      PCM (Phase Change Material) improves cooling efficiency by leveraging its ability to store and release large amounts of thermal energy during its phase transitions (melting and freezing). Unlike conventional cooling methods, PCM absorbs heat as it changes from solid to liquid, maintaining a stable temperature for longer periods without active refrigeration. When the temperature around the PCM drops, it re-solidifies, releasing the stored energy and continuing to regulate the temperature.

      In the Cool Cube product line, PCM helps improve cooling efficiency in the following ways:

      • Temperature Stability: PCM maintains a precise, consistent temperature over time, reducing fluctuations that could compromise sensitive materials like vaccines or lab samples.
      • Energy Efficiency: By absorbing and releasing thermal energy, PCM minimizes the need for constant refrigeration or energy input, especially during transport, leading to lower energy consumption.
      • Extended Cooling Duration: PCM can maintain the desired temperature for a prolonged period, making it ideal for passive cooling solutions during transport or power outages, which improves overall cooling reliability.
      • Freeze Protection: PCM prevents the freezing of materials that should remain at above-freezing temperatures, avoiding the risk of damage due to ice or extreme cold.

      By using PCM, Cool Cube products ensure that temperature-sensitive materials remain within safe temperature ranges with fewer external cooling interventions, thus increasing the overall efficiency and reliability of the system.

      Answer:

      PCM (Phase Change Material) offers several advantages over traditional ice for temperature control, making it a superior choice in applications like the VeriCor Cool Cube. Here’s why:

      • Precise Temperature Control:
        Ice maintains a temperature around 0°C (32°F) as it melts, which can be too cold for many temperature-sensitive materials like vaccines and medicines. This can result in accidental freezing, which can ruin the products. PCM, on the other hand, is specifically formulated to maintain a precise temperature. For example:
        • Refrigerator PCM holds temperatures between 2°C and 8°C.
        • Lab Freezer PCM holds temperatures around -20°C.
        This targeted temperature control prevents freezing (in the case of refrigerator temps) or overheating (in the case of lab freezer temps), ensuring the materials stay within their required temperature range.
      • Longer Duration of Stable Temperatures:
        PCM can maintain a consistent temperature for a longer period than ice. As ice melts, it quickly loses its cooling effectiveness. In contrast, PCM absorbs and releases heat more gradually during its phase change, keeping temperatures stable for extended periods. This makes PCM ideal for transporting materials over long distances or storing them during power outages.
      • Energy Efficiency:
        PCM reduces the need for active refrigeration or the constant replacement of ice packs. It provides a passive, energy-efficient cooling solution. This not only saves energy but also reduces the hassle of constantly replenishing ice, particularly during transport.
      • No Risk of Water Damage:
        When ice melts, it turns into water, which can damage packaging or create messes in storage units. PCM, however, remains self-contained within sealed containers as it changes phases, so there’s no risk of leaks or water damage. This ensures a cleaner, safer environment for sensitive materials.
      • Customized Temperature Ranges:
        PCM can be tailored to specific temperature ranges based on the needs of the products being stored. Ice cannot be customized to maintain temperatures other than around 0°C, making it less versatile. PCM can be used in Cool Cubes for refrigeration, freezing, or even room temperature control, depending on the type of PCM selected.
      • Lightweight and Portable:
        PCM is lighter than carrying large quantities of ice, making Cool Cubes easier to transport. Since PCM is engineered for efficiency, you need less of it compared to the amount of ice you would need for the same cooling effect, which enhances portability.

      Conditioning

      The PCM inside is NOT below its phase change temperature of 21.5°C/70.7°F. Make sure that the storage temperature is always below 20°C/68°F.
      The PCM inside is NOT below its phase change temperature of 4.5°C/40.1°F. Make sure that the storage temperature is always below 4°C/39.2°F.
      The PCM inside is NOT below its phase change temperature of -21.5°C/-6.7°F. Make sure that the freezer temperature is always below -30°C/-9.4°F.
      Yes, for Cool Cubes™ at Fridge Temps. However, before pack-out, the panels must sit out and warm up until they “sweat” so that they don’t make the cooler too cold.
      Yes, for Cool Cubes™ at Fridge Temps. Make sure the refrigerator temperature is below 4°C to ensure panels turn solid (the closer the fridge is to 4.5°C, the longer it will take to turn solid).
      Yes, but to get the panels truly hard, the freezer must maintain a temperature lower than -30°C. Otherwise, the panel will be at the temperature of the freezer (in a liquid state) and just won’t last as long.
      Yes, but they will just take longer to condition (the middle panel will be the last to condition). For the quickest conditioning process, get as much air circulating around the panel as possible.
      If the panels must be stacked we recommend inserting a spacer (pencil, tongue depressor, etc.) between each panel.
      No, but the PCM panels need to be prepped.
      The PCM inside is above its phase change temperature.
      No. It is not necessary to condition the vacuum insulated panel (VIP) system. Storage at room temperature is recommended.

      Maintenance

      If your Cool Cube case gets dirty, the cleaning method will depend on the model you have:

      • Models 03 and 08 (Nylon Fabric Case):
        For these models, you can clean the nylon fabric case by gently wiping it down with a damp cloth and mild detergent. Avoid using harsh chemicals or abrasive materials that could damage the fabric. If the case is heavily soiled, you can use a soft brush with mild soap to scrub the affected areas, then rinse with clean water. Allow the case to air dry completely before use.
      • Models 28 and 96 (Hard Plastic Case):
        For these models, the hard plastic exterior can be cleaned with a mild detergent or disinfectant. Use a soft cloth or sponge to wipe down the surface. It’s safe to rinse the case with water, but make sure to dry it thoroughly before storing or using it again.

      If you have any questions about cleaning your Cool Cube, feel free to contact us at 608.526.6901, and we’ll be happy to help.


      Pack Out

      Vacuum Insulation Panel – a form of thermal insulation consisting of a gas-tight enclosure surrounding a rigid core, from which the air has been evacuated.
      No, but all six panels will maintain a consistent temperature the longest. The fewer the panels, the shorter the temperature holding time.
      No. The PCM panels are replacements superior to the standard gel pack method of cooling.
      No. The PCM panels are replacements superior to the standard ice pack method of cooling.
      Not during use. But during storage/conditioning, electricity may be needed to maintain condition the panels properly.
      Yes. The large cooler can be locked with a small, steel padlock. The small and medium coolers have double zippers that can be fastened together with a small, cable padlock.
      Yes, if they have the same temperature parameters. No, if they require two different parameters.
      Yes, just not at the same time. Temperature controlling panels (the PCM System) can be purchased separately and swapped out depending on use.
      No. Although it is recommended to have a thermometer to monitor the temperature and some filler material (newspaper, bubble-wrap, etc.) to prevent contents from shifting.

      The Cool Cube panels are identified by both the label and tab colors:

      • Blue: For Refrigerator Temperatures PCM, used in the VT and BT product lines.
      • Gray: For Lab Freezer PCM, used in the FT line of Cool Cubes.
      • Tan: For Room Temperature PCM, used in the RT line of Cool Cubes.


      Purchasing Related FAQs

      Credit Cards

      Yes, all major credit cards are accepted.

      Ordering

      Order thru this website, GSA, Amazon or email (order@vericormed.com…please reference a quote). For orders over $10,000 please contact us (608-526-6901) to work with a salesperson.

      Pricing

      Yes. Discounts start at 10 or more of the same SKU per order.

      Shipping

      Usually 1 to 2 business days depending on stock.
      Taxes: United States & Canada
      • Calculated based on delivery location.
      • If $0.00 (Sales tax not collected) is apparent, either VeriCor doesn’t collect sales tax for that state or the order is identified as tax-exempt.
      • If tax-exempt, a valid tax exemption certificate is needed to process the order.
      Brokerage: the fee associated with customs clearance for your inbound shipments.
      • Paid by the “Importer of Record” (customer) based on the value of the shipment to the designated broker.
      • Broker can be identified by the customer prior to shipment (so they use their own), otherwise FedEx will be the default broker.
      • There are ways to avoid broker fees, but there’s time and work involved (example).
      More in-depth resources:


      You may also like…